The new greenhouse at SARC

Construction at SARC is underway. Check back to follow our progress.

  • example of greenhouse
  • The new greenhouse will be similar to this one in Colorado from Nexus
    08/01/2020
  • greenhouse footprint
  • Setting the building footprint
    11/10/2020
  • south view
  • looking South along the east edge
    11/12/2020
  • dirt work
  • Preparing the bed for the cement slab
    11/19/2020
  • no workers present
  • Waiting on plumbing
    11/19/2020
  • Forms placed
  • Placing the forms
    12/02/2020
  • Plumbing installation
  • Plumbing prior to pouring the slab
    12/02/2020
  • Forms placed
  • Placing forms for foundation
    12/03/2020
  • Forms placed
  • Foundation preparation looking south
    12/03/2020
  • preparations for the cement slab pour
  • Getting closer to laying the cement slab
    12/18/2020
  • Rebar preparation for slab of greenhouse
  • rebar is in place and prepared for the pour
    12/22/2020
  • greenhouse slab raw
  • Slab is complete
    01/05/2021
  • Stud walls start
  • and we have a first wall!
    01/12/2021
  • view from north as framing goes up
  • North wall takes shape
    01/19/2021
  • roof truss installed
  • first roof truss is in place
    01/27/2021
  • roof trusses installed
  • roof trusses like dominoes all lined up
    01/28/2021
  • head house under construction
  • The head house starts to take shape
    01/28/2021
  • view of head house looking west, under construction
  • eastside entry and rollup door openings, although the door seems to be just for little people
    01/28/2021
  • headhouse from sw
  • Headhouse from SW ready for windows, doors, siding and shingles
    02/26/2021
  • headhouse from se
  • Headhouse from SE ready for windows, doors, siding and shingles
    02/26/2021
  • headhouse wrapped
  • it is all wrapped up, viewed from the NE.
    03/09/2021
  • headhouse wrapped and ready for siding
  • it is a wrap! Viewed from the SW
    03/09/2021
  • Metal roofing being installed
  • headhouse gets a proper roof.
    03/19/2021
  • Greenhouse skeleton
  • like a vintage erector set the skeleton of the greenhouse is taking shape.
    03/23/2021
  • Installing greenhouse roofing panels
  • acrylic roofing panels are installed
    03/31/2021
  • Headhouse interior being insulated
  • a peek inside the headhouse shows a secret access to the upstairs.
    03/31/2021
  • inside greenhouse area
  • as the panels go up the interior space begins to take shape
    03/31/2021
  • view from SE of greenhouse
  • Glass house construction is complete as viewed from the SE
    05/07/2021
  • view from sw of greenhouse
  • Glass house construction is complete as viewed from the SW
    05/07/2021
  • inside view of greenhouse area
  • Inside bay 2 of greenhouse
    05/07/2021
  • inside greenhouse area
  • Inside bay 1 of greenhouse
    05/07/2021
  • inside view of headhouse area
  • Inside view of headhouse
    05/07/2021